The Lounsbury Associates Companies team performed project management, construction management, I&E inspection and paint inspection. Scope of work also included cost tracking, writing PO’s, procurement of materials and vendor surveillance. Our staff out-fitted a 195 x 35 barge with equipment to produce 50 mcfd. We oversaw installation on the 8″ pipeline with two underground bores: one at 4,800 and the other at 3,000. Total length of the line was 18,000 feet.