Targa Benzene Saturation Unit
Audubon Engineering Solutions performed a FEED, EPC (engineering and design, procurement, and construction), and automation and control for the installation of facility which received a low sulfur natural gasoline stream and converted the benzene to cyclohexane to meet product specifications. The unit was installed at Targa Resources’ Mont Belvieu Facility.
Project Overview:
- Benzene Saturation Process
- Saturate/Hydrogenate low sulfur natural gasoline and convert benzene to cyclohexane
- Fractionation
- Absorption / Product Treating
- Reactor Design
- Product Transfer Pumps & Metering
- Plant Utility Integration (Flare, drain, power, instrument air)
- Brownfield Expansion
Scope of Work:
- Project Management
- Procurement
- FEED Engineering
- Detail Engineering & Design
- Automation and Control
- Construction
- Process Safety Analysis